49th and Rentworth Area Storm Drain Improvements

September 4, 2014

This project includes the installation of additional storm sewer pipe and inlets. These additions will improve drainage by allowing more water to be removed from the street. As a result, storm water will get to the storm sewer more quickly, reducing ponding and street flooding.

The contractor has indicated work will begin on approximately October 1, 2014. It is expected the storm drainage system construction in the area will take approximately 60 days to complete. The installation of the new storm drainage system encompasses the area from the west side of 48th Street to the east side of 50th Street along Rentworth Drive, and directly north of Rentworth Drive between 49th Street and 50th Street between existing businesses. The storm drainage work will involve removal and replacement of street paving, curb and gutter, sidewalks and driveways. This work will also include construction of new storm drainage curb inlets and manholes.

There will be some inconvenience to businesses in this area as pavement sections are removed and replaced and street/driveway locations are closed and barricaded to complete the work. Access to businesses will be maintained throughout the duration of construction, but may be limited during different phases of construction.

This project is funded through the 2012 Storm Bond. The contract for this work has been awarded to K2 Construction of Lincoln, Nebraska. The Public Works and Utilities Department will administer this contract, and Alfred Benesch and Company will provide construction management and inspection of the project. You may contact the Watershed Management Division at 402-441-7589 or the phone numbers shown below for any questions.

49th and Rentworth Storm Drain Improvements Project Area 49th and Rentworth Storm Drain Improvements Project Area

Public Involvement

Pre-construction Meeting - September 10, 2014
8:00 a.m.
Parking lot north of Rentworth Drive between 49th and 50th Streets
Information about the construction schedule, phasing, and duration will be discussed with all interested parties.
Open House - Wednesday, August 28, 2013
5:00 – 6:30 p.m.
Old Cheney Alliance Church, 5201 Old Cheney Rd.
Open House Handout (152 K) PDF

Project Contacts

  • City Project Manager

    Harry Kroos
    Public Works and Utilities, Engineering Services
    Phone: 402-429-4872
    Email: hkroos@lincoln.ne.gov

  • Construction Project Manager

    Steve Irons
    Alfred Benesch & Company
    Phone: 402-310-7459

  • Contractor

    Charlie Heng
    K2 Construction
    Phone: 402-416-6748

Related

2012 Stormwater Improvement Bond Issue