49th and Rentworth Area Storm Drain Improvements

Updated April 28, 2015

Project Overview

This project includes the installation of additional storm sewer pipe and inlets. These additions will improve drainage by allowing more water to be removed from the street. As a result, storm water will get to the storm sewer more quickly, reducing ponding and street flooding.

The installation of the new storm drainage system encompasses the area from the west side of 48th Street to the east side of 50th Street along Rentworth Drive, and directly north of Rentworth Drive between 49th Street and 50th Street between existing businesses. The storm drainage work will involve removal and replacement of street paving, curb and gutter, sidewalks and driveways. This work will also include construction of new storm drainage curb inlets and manholes.

Construction Information

Construction of this project began in October 2014. The installation of the new storm drainage system directly north of Rentworth Drive east of 49th Street was completed in the winter of 2014. Construction for the remaining storm sewer work within 48th Street and along Rentworth Drive is scheduled to begin May 4, 2015.

It is expected the storm drainage system construction in the area will take approximately 49 days to complete. The storm drainage work will involve lane closures of 48th Street, removal and replacement of street paving, curb and gutter, sidewalk, and a driveway. This work will also include construction of new storm drainage curb inlets and manholes.

There will be inconvenience to businesses in this area due to lane closures, barricades, pavement section removal and replacement, and other construction activities to complete the work. Access to businesses will be maintained throughout the duration of construction, but may be limited for the safety of the public.

This project is funded through the 2012 Storm Bond. The contract for this work has been awarded to K2 Construction of Lincoln, Nebraska. The Public Works and Utilities Department will administer this contract, and Alfred Benesch and Company will provide construction management and inspection of the project. You may contact the Watershed Management Division at 402-441-7589 or the phone numbers shown below for any questions.

49th and Rentworth Storm Drain Improvements Project Area 49th and Rentworth Storm Drain Improvements Project Area

Public Involvement

Pre-construction Meeting - September 10, 2014
8:00 a.m.
Parking lot north of Rentworth Drive between 49th and 50th Streets
Information about the construction schedule, phasing, and duration will be discussed with all interested parties.
Open House - Wednesday, August 28, 2013
5:00 – 6:30 p.m.
Old Cheney Alliance Church, 5201 Old Cheney Rd.
Open House Handout (152 K) PDF

Project Contacts

  • City Project Manager

    Jess Sundeen
    Public Works and Utilities, Engineering Services
    Phone: 402-416-5341

  • Construction Project Manager

    Steve Irons
    Alfred Benesch & Company
    Phone: 402-310-7459

  • Contractor

    Charlie Heng
    K2 Construction
    Phone: 402-416-6748