Street Closures List
Pedestrian Closures List
City of Lincoln street closures and pedestrian closures, updated weekly.
Detour Map
This map has all detours for major street closures in Lincoln, updated weekly. Short-term and minor street closures may not appear on this map.
Project Information
Indicates detour map is available
- • 1st from Nance to Superior

- The scope of the work involves widening 1st Street from Nance Avenue to Superior Street by four feet on each side, resurfacing the entire street and adding a roundabout at 1st and Adams.
- • 14th from Fletcher to Alvo

- This project includes widening of 14th Street to two lanes in each direction, turn lanes, a two-lane roundabout at the intersection of 14th and Alvo, a bike trail on the west side of 14th from the I-80 bridge to Humphrey and sidewalks on the remaining portions of the project.
- • 14th from Superior to I-80

- This project consists of improving 14th Street from Superior Street to the I-80 bridge. The street will have two lanes in each direction with a center median. The intersections at 14th and Superior and 14th and Fletcher will also be improved. At 14th and Superior, a multi-lane roundabout will be put in place to increase efficiency and improve safety at the intersection. A traffic signal will be installed at the intersection of Fletcher Ave. and 14th Street.
- • Antelope Valley Parkway from 'K' to 'P'

- This project is along the existing 19th Street alignment from 'K' to 'P' Streets and will reconstruct the roadway to a six-lane median-divided roadway including turn lanes. Also included is the reconstruction at the intersecting streets along the 19th Street corridor; 'L,' 'M,' 'N,' 'O,' and 'P' Streets.
- • Downtown Lincoln Street Resurfacing Project
- This project will mill and overlay approximately six miles of roadway surfacing on eleven streets in the Lincoln Central Business District. Also included is replacement of seven traffic signals.
- • Pioneers from 32nd to 54th

- The project includes street rehabilitation work; complete intersection replacement at 33rd, 40th and 48th streets; new pavement markings; traffic signal/electrical work; storm sewer replacement; and sidewalk and ramp reconstruction.
- • 2012 Residential Rehabilitation Projects
- • South Street Bridge Reconstruction

- The project includes replacement of the existing South Street bridge over Antelope Creek, channel stabilization, water main relocation and sanitary sewer construction.
Other Projects
- • NDOR: 14th Street Bridge Over I-80

- Highway construction work is scheduled to begin, weather permitting, September 26, 2011 on the 14th Street bridge over I-80 at Lincoln. Work includes grading, culverts, bridge, and seeding.
- • LES: Central Lincoln Reliability Project (CLRP)
- The goal of the Central Lincoln Reliability Project is to replace aging cables, meet the growing demand of electricity in central Lincoln and improve system reliability.
2012 Construction Projects 
Map and summary of projects planned for construction in 2012.