Public Works & Utilities Construction Projects

Project start and completion dates are estimates. Information subject to change.

10th and Salt Creek Bridge Project

10th & Salt Creek Bridge

Bridge Replacement Project

A recent structural evaluation has determined that the bridge would need to be replaced in order to meet the City of Lincoln's current and future vehicular and pedestrian needs. This project will include removing the existing bridge and constructing a new bridge at the current location.

  • Start: May 8, 2017
  • Completion: Mid-2018

Go

27th from Holdrege to Fletcher

Concrete Pavement Repair Project

The project consists of replacing and/or repairing concrete panels, joints, median surfacing, curbs, and curb inlets within the street that are deteriorated. Areas of the project with asphalt paving will be replaced with full depth concrete.

  • Start: Apr 17, 2017
  • Completion: Nov. 2017

Go

33rd from Holdrege to Madison

Mill, Overlay and Storm Drainage Improvements

The planned construction will include repairing or replacing deteriorated concrete base, curb, milling and replacing the asphalt surface. Other work includes replacing damaged storm drainage structures and inlet tops, impacted sidewalks, and reconstructing curb ramps.

  • Start: Jun. 19, 2017
  • Completion: Mid-Oct. 2017

Go

Alley Repaving Project

“G” to “H” Streets; 16th to 17th Streets

Public Works and Utilities will replace the east/west alley in the middle of the block bordered by 16th, 17th, “G” and “H” Streets. All streets will remain open during construction, but access to driveways and parking will be restricted.

  • Start: Sep. 5, 2017
  • Completion: Oct. 31, 2017

Go

W Avon and Lancaster Area

Water Main Replacement Project

Work will begin Monday, July 10, to replace the water main along West Avon Lane from Vine Street to Colony Lane, in addition to an intersecting water main line on Lancaster Lane from West Avon Lane to East Avon Lane.

  • Start: Jul. 10, 2017
  • Completion: 12 weeks

Go

Coddington and West Van Dorn

Safety Improvement Project

The purpose of this project is to reduce vehicle crashes by significantly reducing the number of conflict points at the intersection. A single-lane roundabout will be constructed within the intersection. The project includes the phased construction of new concrete pavement, trails, sidewalks and box culvert extensions; the installation of a new storm drainage system; and new signage, pavement markings and street lighting.

  • Start: Apr 24, 2017
  • Completion: Dec. 2017

Go

Dudley from 25th to 27th • 25th from Dudley to “Y”

Water Main Replacement • Water Service Transfer

This project will replace the water main along Dudley from 25th to 27th Streets and transfer water services along 25th from Dudley to “Y” Streets.

  • Start: Sep. 18, 2017
  • Completion: Nov. 2017

Go

Fletcher from 7th to 14th – Culvert Replacement

Storm Drainage Improvement Project

The City of Lincoln proposes to bore a new storm sewer culvert under Fletcher Avenue between 7th Street and 14th Street. This project is necessary to provide the public with improved storm water drainage through this area.

  • Start: Oct. 2, 2017
  • Completion: End of Oct. 2017

Go

Fremont from Touzalin to 70th

Water Main Replacement Project

This project will replace the water main along Fremont Street from Touzalin to 70th.

  • Start: May 15, 2017
  • Completion: Sep. 2017

Go

Old Cheney from 40th to Highway 2

Pavement Repair Project

Construction will include repairing or replacing deteriorated concrete panels and curbs, sealing joints and cracks and milling the concrete surface before overlaying with asphalt. Other work will include the replacement of damaged storm drainage inlet tops, utility adjustments and restoration of traffic signal elements impacted by the work.

  • Project Start: Apr 26, 2017
  • Completion: Mid-Nov 2017

Go

Park Avenue from 9th to 10th

Storm Drainage Improvement Project

The City of Lincoln is beginning construction of a new storm drainage system along the south side of Park Avenue from just west of 9th Street to just west of 10th Street.

  • Start: Sep. 18, 2017
  • Completion: End of Nov. 2017

Go

Superior from 27th to Cornhusker

Concrete Pavement Repair Project

The project consists of replacing and/or repairing concrete panels, joints, median surfacing, curbs, and curb inlets within the street that are deteriorated. Areas of the project with asphalt paving will be replaced with full depth concrete.

  • Project Start: Apr 17, 2017
  • Completion: Nov 4, 2017

Go