2017 Residential Rehabilitation - Pavement Repairs

April 24, 2017

This week, MTZ Construction is beginning to work on sidewalk and ramp removal on three corners of the intersection of Whitewater & Julesburg, and also on 15th Street from Humphrey to Julesburg. MTZ will also be working on pavement repairs on Whitewater, Silverthorne, and on 15th Street between Julesburg & Alvo Rd.

Scope of Work

This is a pavement preservation project intended to maintain and improve the driving surface of the existing roadway facility. Pedestrian curb ramps that do not meet current Federal and local standards will be reconstructed to meet those standards. This project will remove and replace areas of pavement that have deteriorated.

Schedule

Work is anticipated to begin April 24, 2017. Construction is expected to be completed by the end of September 2017.

Access During Construction

The Contactor will be allowed a total closure of the residential street; however, local access to homes will be maintained whenever possible. Access for emergency vehicles will be maintained at all times.

Project Area

  • Construction Area Beginning April 24
  • Project Area

Re-center mapFull-screen

Public Involvement

Open House - April 18, 2017
6:00 p.m. – 7:00 p.m.
Kooser Elementary, 7301 N. 13th Street

Project Contacts

  • Construction Project Manager

    Mark Miller
    Public Works and Utilities, Engineering Services
    Phone: 402-416-5348
    Email: mmiller@lincoln.ne.gov

  • Project Engineer

    Erin Sokolik
    Public Works and Utilities, Engineering Services
    Phone: 402-416-9460