Project No. 700431

Click for larger view Roof Mounted Radio Antenna at Wastewater Lift Station C-11 Click for larger view Pole Mounted Radio Antenna at Wastewater Lift Station C-10 Click for larger view Roof Mounted Radio Antenna mounting at Lift Station C-9 Click for larger view Typical Radio Communications Panel Box

Construction included improvements of the existing telemetry system for the Wastewater Collection System and Stormwater System Lift Station pumping operations. The lift stations are at key locations in the Wastewater Collection System and key lower locations in the Stormwater System. These lift stations pump wastewater and stormwater to higher elevations, allowing discharge to flow downstream to stormwater lines, wastewater sanitary sewers and eventually the City's wastewater treatment facilities. Currently, there are fourteen (14) wastewater lift stations and four (4) stormwater pumping stations that are monitored in the City.

The existing telemetry system for remote monitoring and controlling of the Lift Stations was replaced with updated and newer technology that utilizes a more reliable radio telemetry communication system than the current hard-wired telephone system. The effective monitoring of pumping systems status at these stations is critical to maintaining proper and reliable service to protect the public health, safety and environment for the citizens of Lincoln. The updated remote monitoring improvements provide for greater security of these locations and operations, and allows maintenance staff to monitor and react more quickly to any pumping system alarms or failures. This remote capability reduces the risk for flooding, sanitary sewer overflows or backups of wastewater into upstream private property or residences served by the lift stations.

A unique challenge of this project was that continuous service of the wastewater pumping systems had to be maintained while the telemetry replacements and improvements were made at each of the stations. Work proceeded on a phased basis at each of the stations to ensure that service was maintained. Telemetry improvements were completed for two of the larger wastewater lift stations earlier in 2007.

Project Summary

General:
     Lift Stations Monitored:Wastewater - 14
Stormwater - 4
Total Project Cost:$ 275,000 (Estimated)
Project Construction Cost:$190,500
Construction Status:Complete
Funding:Sanitary Sewer Revenue Funds

Project Schedule

Start of ConstructionDecember 2007
Substantial CompletionMay 2008
Final CompletionJune 2008

Project Contacts

Technical Maintenance & Service (Construction Contractor):

Olsson Associates

Lincoln Wastewater System: