Wastewater and Stormwater Lift Station Telemetry Replacement & Improvements Project
Project No. 700431
Roof Mounted Radio Antenna at Wastewater Lift Station C-11
Pole Mounted Radio Antenna at Wastewater Lift Station C-10
Roof Mounted Radio Antenna mounting at Lift Station C-9
Typical Radio Communications Panel Box
Construction included improvements of the existing telemetry system for the Wastewater Collection System and Stormwater System Lift Station pumping operations. The lift stations are at key locations in the Wastewater Collection System and key lower locations in the Stormwater System. These lift stations pump wastewater and stormwater to higher elevations, allowing discharge to flow downstream to stormwater lines, wastewater sanitary sewers and eventually the City's wastewater treatment facilities. Currently, there are fourteen (14) wastewater lift stations and four (4) stormwater pumping stations that are monitored in the City.
The existing telemetry system for remote monitoring and controlling of the Lift Stations was replaced with updated and newer technology that utilizes a more reliable radio telemetry communication system than the current hard-wired telephone system. The effective monitoring of pumping systems status at these stations is critical to maintaining proper and reliable service to protect the public health, safety and environment for the citizens of Lincoln. The updated remote monitoring improvements provide for greater security of these locations and operations, and allows maintenance staff to monitor and react more quickly to any pumping system alarms or failures. This remote capability reduces the risk for flooding, sanitary sewer overflows or backups of wastewater into upstream private property or residences served by the lift stations.
A unique challenge of this project was that continuous service of the wastewater pumping systems had to be maintained while the telemetry replacements and improvements were made at each of the stations. Work proceeded on a phased basis at each of the stations to ensure that service was maintained. Telemetry improvements were completed for two of the larger wastewater lift stations earlier in 2007.
Project Summary
| General: | |
|---|---|
| Lift Stations Monitored: | Wastewater - 14 Stormwater - 4 |
| Total Project Cost: | $ 275,000 (Estimated) |
| Project Construction Cost: | $190,500 |
| Construction Status: | Complete |
| Funding: | Sanitary Sewer Revenue Funds |
Project Schedule
| Start of Construction | December 2007 |
|---|---|
| Substantial Completion | May 2008 |
| Final Completion | June 2008 |
Project Contacts
Technical Maintenance & Service (Construction Contractor):
- Chris Egger - Project Manager
- egger@cornhusker.net
- (402) 467-3750
Olsson Associates
- Steve Ingracia - Project Engineer
- singracia@oaconsulting.com
- (402) 474-6311
Lincoln Wastewater System:
- Steve Crisler - Project Manager
- Facilities Maintenance Manager
- scrisler@lincoln.ne.gov