Wastewater Projects Under Construction
- • Northeast Wastewater Treatment Facility Grit Handling and Primary Pump Station Improvements
- The grit improvements include: installation of new grit classification, cleaning, washing and conveyance handling equipment. The existing grit tankage and process building will be modified to accommodate the new grit system. An addition to the existing building will house the cleaning, conveyance, handling and load out system.
- • Selected Replacements
- Selected replacement projects are those that are done in order to maintain the current wastewater infrastructure. There are several types of projects as follows: manhole rehabilitation, open trench, point repairs, pipe bursting and cured in place piping (CIPP).
- • Stevens Creek Basin Trunk Sewer Phase II
- The Phase II trunk sewer will have a pipe diameter of 66-inches and will extend from the end of Phase I to just south of the Murdock Trail (approximately N. 94th Street).