Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
Lincoln Wastewater System

Study Reports


Beal Slough Relief Trunk Sewer
The memorandum, alignment study, and geotechnical report were initiated to evaluate and select an alignment for the extension of the Beal Slough sewer system to serve future growth in south Lincoln. The reports initially referred to Phases I and II. Phase I has been completed, and Phase II has been broken up into Phases II and III for funding purposes.
Design Memorandum (5.14 M) Acrobat Document
Alignment Study (4.5 M) Acrobat Document
Geotechnical Investigation (505 K) Acrobat Document
Northeast Salt Creek Collection System Study (3 M) Acrobat Document
The purpose of this Technical Memorandum is to review the service area for the Northeast Salt Creek Basin sanitary sewer collection system and to determine the feasible short term and long term facilities required to serve the area.
Oak Creek Basin Trunk Sewer and Sub-Basin Sewers Preliminary Design Report
The objective of the project is to develop and evaluate existing system capacities and identify the need for various system improvements in the Oak Creek Basin.
Middle Creek Basin Studies
'D' Street Lift Station Study (4.01 M) Acrobat Document - This is an initial study that reviews the 'A' Street sewer and future service area as well as examining the concept of combining the 'D' Street and 'P' Street lift stations into one.
West 'O' Street Study - This study examines the West 'O' street basin, extends pipelines out to beyond 63rd Street and examines the areas to be served.
Salt Creek Water Quality Studies
The purpose of the Salt Creek Water Quality Studies is to develop site-specific chronic ammonia criteria for Segment LP2-20000 of Salt Creek based on extensive chemical, biological, and physical analysis.
Stevens Creek Trunk Sewer Preliminary Design Report
This project will provide collection system capacity for new growth areas located east and northeast of the City in the Stevens Creek Basin.
Upper Southeast Salt Creek Alignment Study
The Preliminary Routing/Corridor Study and Design of the Upper Southeast Salt Creek Trunk Sewer was initiated to evaluate and select an alignment for the extension of the Salt Creek sewer system to serve future growth in south Lincoln.

Related Links

Validate

Lincoln Wastewater System