All documents in Adobe Acrobat (PDF) format. ![]()
| Table No. | Description | Page |
|---|---|---|
| 1.1 | Update of Olsson Associates' 1999 Conceptual Cost Estimates | 1-3 (287 K) |
| 2.1 | Urban Planning Zone Service Area Summary | 2-3 (248 K) |
| 2.2 | Future Service Area Requirements vs. Capacity | 2-4 (248 K) |
| 2.3 | Hydraulic Grade Line Calculations | 2-5 (248 K) |
| 2.4 | Upstream Basin Service Requirements | 2-8 (248 K) |
| 4.1 | Alignment Selection Criteria and Ranking | 4-1 (34 K) |
| 4.2 | Engineer's Estimated Total Project Cost | 4-2 (34 K) |