2005 Stormwater Bond Issue

38th and Sewell


38th & Sewell Area Improvements

Contact Person:
Craig Aldridge
402-416-5349
Type of Project:
Design and Construction
Urban Storm Drain Project
Description:
The storm drain system in this area is too small to handle rain from larger storms which results in street flooding. The solution is to build a new stormwater drainage system along side the existing underground stormwater system. The added system will reduce street flooding in this area.
Project Status:
Construction Complete
Consultant:
E&A
Contractor:
Skoda Construction
Video:
Photos:
Construction:

July 2006

July 2006

July 2006
Map of Project:
Public Meetings:
October 13, 2005
February 2, 2006: Meeting Notice
May 24, 2006: Meeting Notice