2005 Stormwater Bond Issue

9th and 'N' Box Culvert Rehabilitation


9th & 'N' Box Culvert Rehabilitation

Contact Person:
Kris Humphrey
402-326-1176
Type of Project:
Design and Construction
Urban Storm Drain Project
Description:
There has been serious damage to the foundation under the limestone and concrete storm drain system that was built back in the 1920's. If not repaired some areas of the existing storm drain walls could collapse causing damage to underground utilities and/or to the street above. This project will repair damaged sections of the foundation, and fill holes in the walls and ceiling of the drainage system for three blocks.
Project Status:
Construction Complete
Consultant:
Speece & Lewis
Contractor:
K2 Construction
Videos:
Photos:
Prior to Construction:

December 2004
Below 9th and 'N' Street - top of culvert deteriorating

December 2004
Below 9th and 'N' Street - top of culvert deteriorating with daylight visible through cracks

December 2004
Below 9th and 'N' Street - hole in bottom of culvert
Construction:
Before

Water is pumped from damaged area in preparation for repairs
After
June 2006
Area after restoration is complete
 

9th and 'N'