Stevens Creek Stream Stability Main Stem

- Contact Person:
- Devin Biesecker
- 402-441-4955
- Type of Project:
- Design and Construction
- Stream Channel Stabilization
- Project Description:
- The design of two grade stabilization projects along Stevens Creek and a tributary, both near Adams Street. These projects will stabilize a portion of the channels and prevent erosion from moving upstream. If the erosion is allowed to continue and move upstream it could pose a threat to public infrastructure and private property.
- Project Status:
- Construction Complete
- Consultant:
- Intuition and Logic
- Contractor:
- General Excavating
- Photos:


- Map of Project:
- Download Project Map (194 K)

- Download Project Map (194 K)