2007 Stormwater Bond Issue: Watershed Master Plan Implementation Projects

Beal Slough Flood Protection at 14th and Hwy. 2


Beal Slough Flood Protection at 14th and Hwy. 2

Lower Platte South Natural Resources District
Contact Person:
Devin Biesecker
441-4955
Type of Project:
Design and Construction
Flood Control Project
Description:
A large portion of the Nebraska State Penitentiary will be in the new Beal Slough Floodplain. The project will consist of channel improvements, improvement of 14th Street bridge over Beal Slough and stream stability. The result of this project will reduce the flood risk for the Nebraska State Penitentiary and other properties in the area of 14th and Hwy 2. This project is being led by the Lower Platte South NRD with the City providing a cost share on the design.
Project Status:
Design
Consultant:
Olsson Associates
Contractor:
To Be Determined
Estimated Construction Start Date:
Spring 2011
Estimated Construction Completion Date:
Summer 2012
Map of Project:
Public Meetings:
August 31, 2010:
March 25, 2010