2007 Stormwater Bond Issue

21st from 'P' to 'N'


21st from 'P' to 'N' Area Improvements

Contact Person:
Ben Higgins
441-7589
Type of Project:
Design and Construction
Urban Storm Drain Project
Description:
Approximately two blocks of a large, new storm drainage pipe project near the 21st Street Corridor from 'N' street to 'P' Street. This project is being constructed in conjunction with the Antelope Valley Project. This project is part a of a larger 21st Street corridor bypass system and is designed to capture storm drainage from the west side of Antelope Creek and relay it downstream to an outlet near 'R' Street.
Project Status:
Construction Complete
Consultant:
Brinkerhoff/Olsson Associates
Contractor:
Park Construction
Map of Project: