48th and Holdrege Area Improvements
- Contact Person:
- Jennifer Thompson
- 441-5671
- Type of Project:
- Design and Construction
- Urban Storm Drain Project
- Description:
- An additional stormwater system will parallel the existing system near 48th and Holdrege Streets in order to reduce system deficiencies. The stormwater system will reduce the potential for arterial street flooding and reduce the potential for ponding on private property.
- Project Status:
- Construction Complete
- Consultant:
- JEO Consulting Group, Inc.
- Contractor:
- Pavers, Inc.
- Photos:
- Construction:

May 2009
May 2009
June 2009- Map of Project:
- Download Project Map (194 K)

- Download Project Map (194 K)
- Public Meetings:
- October 3, 2007