2007 Stormwater Bond Issue

53rd and Sumner/Circle Drive


53rd and Sumner/Circle Drive Area Improvements

Contact Person:
Jennifer Thompson
441-5671
Type of Project:
Design and Construction
Urban Storm Drain Project
Description:
A storm drainage system has been constructed along Sumner Street from 53rd to 55th Streets which coincided with the construction of another nearby storm drainage system along Circle Drive, near 58th Street. The addition of these storm drainage systems consisted of new storm drain pipes as well as new inlets that collect additional stormwater runoff from the area. The systems reduce the potential for structural flooding and reduce the potential for ponding on private property.
Project Status:
Construction Complete
Consultant:
HWS Consulting Group, Inc.
Contractor:
Pavers LLC
Map of Project:
Public Meetings:
January 22, 2008 - Preliminary Design Open House
July 17, 2008 - Pre-Construction Open House