Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
2007 Stormwater Bond Issue: Watershed Master Plan Implementation Projects

98th and Adams Area Improvements


98th and Adams Area Improvements

Lower Platte South Natural Resources District
Contact Person:
Devin Biesecker
441-4955
Type of Project:
Design and Construction
Stream Stability
Description:
The design and construction of stream stability measures in Stevens Creek near 98th and Adams. Currently Stevens Creek and a tributary to Stevens Creek are degrading in the area of 98th and Adams. This project will result in stabilizing the stream to reduce the amount of degradation and vegetation loss in these areas and improve water quality by reducing the amount of sedimentation in the streams. This project is being led by the Lower Platte South NRD with the City providing a cost share on the design and construction.
Project Status:
Construction Complete
Consultant:
Intuition and Logic
Contractor:
General Excavating
Map of Project:
Validate

2007 Stormwater Bond Issue Projects