Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
2007 Stormwater Bond Issue: Watershed Master Plan Implementation Projects

Preliminary Engineering for Watershed Master Plans


Preliminary Engineering for Watershed Master Plans

Lower Platte South Natural Resources District
Contact Person:
Ed Kouma
441-7018
Type of Project:
Preliminary Engineering Watershed Master Plan
Watershed Master Plan
Description:
The goal of the study is to develop a master plan for Little Salt Creek that will be used as a tool to gauge conditions in the watershed regarding stormwater quantity and quality, channel stability, maintenance and operations, and financial impacts as well as environmental impacts that are occurring today or are projected to result from future development or other changes in the basin.
The major components of this master plan are the development of an updated floodplain, capital projects, and guidances for future development. Once approved, the master plan will be a sub-plan of the Lincoln and Lancaster County Comprehensive plan. This is a joint project being led by the City with the Lower Platte South NRD providing cost share on the study.
Note: There is no placement of an icon for this project on the accompanying map.
Project Status:
Complete
Consultant:
Intuition and Logic
Public Meetings:
April 22, 2008
February 24, 2009
Related Links
Watershed Master Plans
Validate

2007 Stormwater Bond Issue Projects