Taylor Park Water Quality and Stream Stability
- Contact Person:
- Rock Krzycki
- 441-4959
- Type of Project:
- Design and Construction
- Best Management Practice
- Description:
- The goal of this project is to reduce erosion issues, improve water quality and reduce street flooding (Mesaverde Drive south of Taylor Park). This was done by stabilizing the channel banks, constructing small grade control structures, creating a water quality cell near the south end of the park and constructing an stormwater overflow route from Mesaverde Drive to the channel. This project was being led by Public Works in coordination with the Parks Dept.
- Project Status:
- Construction Complete
- Consultant:
- The Flatwater Group
- Contractor:
- Nemaha Landscaping
- Photos:
- Bank Erosion Prior to Construction:

- Construction:

April 2008- Native Vegetation:

July 2009
July 2009- Map of Project:
- Download Project Map (219 K)

- Download Project Map (219 K)
- Public Meetings:
- April 25, 2006
- May 15, 2006
- November 20, 2007
- May 15, 2006