2012 Stormwater Improvement Bond Issue


Facts About The 2012 Stormwater Improvement Bond Issue

Election Date:
November 6, 2012
Total Bond Issue:
$7.9 Million
For more Information:
Public Works and Utilities Department 402-441-7589
lincoln.ne.gov, keyword: watershed

What Does This Bond Issue Include?

This bond issue will provide for:

  • design and construction of eight urban storm drainage projects (listed below)
  • flood reduction project for urban watershed in the 56th and Morton area (listed below)
  • stream rehabilitation and waterway work on Parks and Recreation property (listed below)
  • design and construction of master planned basin projects (listed below)
  • water quality projects incorporating best management practices
  • preliminary engineering for basin master plans to model drainage and determine future projects

What Will These Projects Do?

The improvements will:

  • reduce stormwater runoff and flooding if major rains occur
  • reduce flooding impacts from major stream channels
  • prevent or repair degraded stream channels
  • improve water quality

What is the Impact on Taxpayers?

Approval of the bond issue gives the City the authority to issue general obligation bonds and levy an annual tax rate to finance the projects. Assuming the current interest rates, this bond issue will cost the owner of a $150,000 home about $5.40 per year

Where are These Projects?

11th and Harrison area
rehabilitation of existing drainage system due to structural concerns
8th and Park area
rehabilitation of existing drainage system due to structural concerns
"J" and "L", 53rd to 55th area
replacement and extension of current under-capacity drainage system
56th and Colfax area
new drainage system to reduce localized flooding impacts
58th and Wilshire area
replacement and extension of current under-capacity drainage system
49th and Rentworth area
replacement and extension of current under-capacity drainage system
7th and Old Cheney area
replacement of currently undersized culvert to reduce localized flooding impacts
Miscellaneous Repairs
repairs of various minor storm drain systems including downtown inlets
West "A" and Southwest 17th Storm Drain Improvements
Old Cheney Cutoff Stream Stability Project
56th and Morton Area channel improvements
channel improvements to reduce localized flooding
Roper Park
channel rehabilitation and water quality project
Projects for Watershed Master Plan Areas
Trendwood Park Water Quality BMP
Best Management Practice Projects
Floodplain/Floodprone Area Engineering and Projects

Related Links

Stormwater Bond Projects Virtual Tour

Acrobat (PDF) Version of Fact Sheet (496 K) Acrobat Document