Lincoln on the Move is investing in improvements to approximately 1.3 miles of 17th Street from “A” Street to “S” Street. These improvements may include a mill and overlay of the existing surface and base repairs where required, joint and crack sealing, public utility adjustments, pavement markings and inlet top replacements. Additional work with other funding sources may include upgrades to the existing curb ramps to comply with the Federal Americans with Disabilities Act (ADA) requirements.
The south project limits are to be coordinated with the street improvement project on “A” Street from 6th to 17th streets. North project limits are to be coordinated with UNL.
Construction is planned to begin in fall of 2024 and be completed in summer of 2025.
The project will require lane closures during construction on 17th Street. Sidewalk closures will be necessary while curb ramps are being replaced.
Craig Aldridge, Design Engineer City of Lincoln, LTU Project Delivery caldridge@lincoln.ne.gov 402-416-5349
Marc Rosso, Construction Engineer City of Lincoln, LTU Project Delivery mrosso@lincoln.ne.gov 531-207-3244