37th and Van Dorn Area Water Main Replacement

This project will replace water mains in the project area using a six-inch CIPP lining. Construction will take place along the following streets:

  • 36th Street from 37th to South streets
  • 37th Street from South to Van Dorn streets
  • 39th Street from Sewell to Van Dorn streets
  • Sewell Street from Scott Avenue to 39th Street

Project Location

Schedule

Construction is scheduled to take place in 2024.

Access During Construction

Construction will require the closure of streets and sidewalks in the work area. Local access will be maintained to the extent possible.

Project Contacts