This project involves analyzing the intersection of 84th Street and Cornhusker Highway to improve safety. A continuous green-T intersection, signal reconstruction with lane modifications and a roundabout concept were all analyzed, and a roundabout was selected to move forward with design and construction.
This project is federally funded.
Construction is tentatively planned to begin in 2027.
Lane closures will be needed to facilitate construction. Access will be maintained at all times.
Craig Aldridge, Design Engineer City of Lincoln, LTU Project Delivery caldridge@lincoln.ne.gov 402-416-5349
Russ Gasper, Construction Engineer City of Lincoln, LTU Project Delivery rgasper@lincoln.ne.gov 402-580-8438