Arbor Road from 56th Street to 70th Street

Street Rehabilitation Project

The purpose of this project was to preserve the transportation asset, improve the reliability of Lincoln’s transportation system, and ensure the mobility of the traveling public.

Scope of Work

This project rehabilitated the pavement along Arbor Road from 56th Street to 70th Street to improve roadway conditions as necessitated by the pavement age and condition. The project included the intersections of 56th Street and 70th Street.

Location Type of Work
56th Street to 210 feet east of 56th Street Full Depth Concrete Replacement
210 feet east of 56th Street to 70th Street Patching with asphalt milling and overlay

Construction Schedule

Construction took place in 2020.

  • Project Area

Project Contacts

  • Gaylon Masek, Construction Project Manager

    City of Lincoln, LTU Project Delivery
    Email: gmasek@lincoln.ne.gov
    Phone: 402-416-7486

  • Jarred Horsky, Project Contractor

    Constructors, Inc.
    Phone: 402-984-4512