This project will include an assessment and construction of the appropriate maintenance treatment for bridges at six locations throughout the city. Bridges include:
The improvements on this project would consist of bridge rehabilitation, including deck patching and overlays, joint replacement, approach slab repairs, rail repairs, and sidewalk repairs.
Project information sheet Hoja informativa del proyecto
Construction is anticipated to take place in 2027.
The project would be constructed under traffic with lane closures controlled by appropriate traffic control devices and practices; however, closures would be required to accommodate work on the Penny Bridges. Closures may also be required to accommodate work on other bridge locations.
Potential Detour Routes
Craig Aldridge, Design Engineer LTU Project Delivery caldridge@lincoln.ne.gov 402-416-5349