This project will improve Cotner Boulevard between “O” and Starr streets through a mill and overlay of the asphalt surface and replacement of concrete in the area. Existing traffic signals at Cotner & Holdrege and Cotner & Starr will be replaced with new traffic signals. A side path has been proposed on Cotner Boulevard from “R” Street to North 66th Street.
The project is currently in design. Construction is tentatively planned for 2027.
Street closures will be necessary during construction.
Craig Aldridge, Design Engineer City of Lincoln, LTU Project Delivery caldridge@lincoln.ne.gov 402-441-7711
Russ Gasper, Construction Engineer City of Lincoln, LTU Project Delivery rgasper@lincoln.ne.gov 402-580-8438