Citywide Sidewalk and Ramp Repairs - Northeast Lincoln

This project will repair selected sections of sidewalk in the area of 70th and 84th streets from Holdrege to Adams streets. The project includes repairs on approximately 0.5 miles of sidewalk, and 20 pedestrian ramps will be reconstructed.

Project Area

Individual repair locations will be within the general project area.

Funding

Schedule

Access During Construction

Due to the nature of work, there may be times areas are closed to pedestrians.

Project Contact

  • Gaylon Masek, Construction Project Manager

    City of Lincoln, LTU Project Delivery
    gmasek@lincoln.ne.gov
    402-416-7486

  • Marc Rosso, Construction Engineer

    City of Lincoln, LTU Project Delivery
    mrosso@lincoln.ne.gov
    531-207-3244